A look inside The High Bay at our Oil & Gas facility in Houston, TX. The blowout preventers seen here weigh between 450-500 thousand pounds, and will make up the lower stacks of the final unit. #GE #manufacturing #technology (Taken with instagram)
18 notes
-
pod313 reblogged this from generalelectric
-
sixthland reblogged this from generalelectric
-
shima-ken liked this
-
divine liked this
-
noahkalina liked this
-
greghaystuff reblogged this from generalelectric
-
dmdhashw liked this
-
dmdhashw reblogged this from generalelectric
-
un liked this
-
rellac reblogged this from generalelectric
-
generalelectric posted this
